[1] Dabirian, SH., Abbaspour, S., Khanzadi, M., & Ahmadi, M. Dynamic modelling of human resource allocation in construction projects. International Journal of Construction Management, 2019, https://doi.org/10.1080/15623599.2019.1616411.
[2] کاظمی، عالیه؛ و اسماعیلی ترکان پوری، کیوان، تخصیص مطلوب نیروی انسانی در آزمایشگاه پزشکی با استفاده از روش فرایند تحلیل سلسله مراتبی، مجله علوم آزمایشگاهی، سال هشتم شماره ۳ (۲۰)، 1393، 90-۹۶.
[3] Erasmus, J., Vanderfeesten, I., Traganos, K., Jie-A-Looi, X., Kleingeld, A., & Grefen, P. A Method to Enable Ability-Based Human Resource Allocation in Business Process Management Systems. Lecture Notes in Business Information Processing, 335, 2018, https://doi.org/10.1007/978-3-030-02302-73.
[4] Arias, M., Munoz-Gama, J., & Sepúlveda, M. Towards a Taxonomy of Human Resource Allocation Criteria. Lecture Notes in Business Information Processing, 308, 2018, https://doi.org/10.1007/978-3-319-74030-0_37.
[5] Yua, L., Zhang, C., Yang, H., & Miao, L. Novel methods for resource allocation in humanitarian logistics considering human suffering. Computers & Industrial Engineering, 2018, 119, 1-20.
[6] Ballesteros-Pérez, P., Ting Phu, F.T, & Mora-Melià, D. Human Resource Allocation to Multiple Projects Based on Members’ Expertise, Group Heterogeneity, and Social Cohesion. Journal of Construction Engineering and Management, 145(2), 2018, https://doi.org/10.1061/(ASCE)CO.1943-7862.0001612.
[7] Yousefi, M. & Yousefi, M. Human resource allocation in an emergency department: A meta-model-based simulation optimization. Kybernetes, 49(3), 2019, 779-796.
[8] Alvarez-Valdés, R., Crespo, E., Tamarit, J.M., & Villa, F. GRASP and path relinking for project scheduling under partially renewable resources. European Journal of Operational Research, 189(3), 2008, 1153–1170.
[9] Tritschler, M., Naber, A., & Kolisch, R. A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles. European Journal of Operational Research, 262(1), 2017, 262–273.
[10] Vanhoucke, M. Setup times and fast tracking in resource-constrained project scheduling. Computers & Industrial Engineering, 54(5), 2008, 1062–1070.
[11] مهمانچی، عرفان؛ و شادرخ، شهرام، یک مدل ریاضی برای حل همزمان مسئله زمانبندی پروژه و تخصیص نیروی انسانی، نشریه مهندسی صنایع، ۱، 1393، ۴۵ -۵۴.
[12] ادهم، داود؛ مهدوی، عبدالله؛ مهرتک، محمد؛ ابراهیمی، کمال؛ و آذری، آرزو، مقایسه تخصیص منابع انسانی بیمارستانهای عمومیدانشگاهی شهرستانهای استان آذربایجانشرقی با استاندارد کشوری، مجله سلامت و بهداشت، ۵ (۲۴)، 1394، ۵۰۷ -۵۱۶.
[13] شفیعی، مرتضی؛ و انگاشته، بلقیس، تخصیص بهینه منابع انسانی به پایگاه های اورژانس با استفاده از مدل تحلیل پوششی داده های متمرکز، فصلنامه پژوهش های مدیریت منابع سازمانی، ۱(۲۱)، 1395، ۱۰۵ -۱۳۲.
[14] فلاح نژاد، محمدصابر؛ خلیلی، سعید؛ و محمدزاده، هادی، تخصیص تعداد بهینه نیروی انسانی به خط تولید در شرایط عدم قطعیت با استفاده از تئوری صف و منطق فازی، نشریه بین المللی مهندسی صنایع و مدیریت تولید، 27(۲)، 1395، ۱۸۷.
[15] ماکویی، احمد؛ بشیری، مهدی؛ و صمدپور، الهام، مسیریابی وسایل نقلیه برای توزیع کالاهای فسادپذیر با برنامه ریزی تخصیص نیروی انسانی در مسیرها، نشریه بین المللی مهندسی صنایع و مدیریت تولید، ۲، 1396، ۲۱۹ -۲۲۶.
[16] سمویی، پروانه؛ فتاحی، پرویز؛ و زندیه، مصطفی، ارائه الگوریتم هیبریدی بهینه سازی توده ذرات و تئوری محدودیت ها برای حل مسائل همزمان بالانس خطوط مونتاژ دو طرفه مدل های ترکیبی و تخصیص نیروی انسانی، نشریه بین المللی مهندسی صنایع و مدیریت تولید، 3، 1396، ۴۰۵ -۴۱۹.
[17] فتاحی، پرویز؛ سمویی، پروانه؛ و زندیه، مصطفی، الگوریتم انجماد تدریجی چندهدفه جهت مسئله هم زمان بالانس خطوط مونتاژ دوطرفه و تخصیص نیروی انسانی، مجله مدیریت تولید و عملیات، 1 (۱۴)، 1396، ۱ -۲۰.
[18] کمپانی، محمدسعید؛ و عظیمی، پرهام، توسعه یک مدل جدید دوهدفه و حل آن بوسیله بهینه سازی از طریق شبیه سازی جهت تخصیص بهینه نیروی انسانی و تجهیزات موازی به ایستگاه ها در یک خط تولید، فصلنامه مطالعات مدیریت صنعتی، ۴۶، 1396، ۵۷ -۷۱.
[19] Kwak, W., Shi, Y., & Jung, K. Human Resource Allocation in a CPA Firm: A Fuzzy Set Approach. Review of Quantitative Finance and Accounting 20, 2003, 277–290.
[20] L.Saaty, T., Peniwati, K., & S.Shang, J. The analytic hierarchy process and human resource allocation: Half the story. Mathematical and Computer Modelling, 46(7–8), 2007, 1041-1053.
[21] Lin, CH-L., & Gen, M. Multi-criteria human resource allocation for solving multistage combinatorial optimization problems using multi-objective hybrid genetic algorithm. Expert Systems with Applications, 34(4), 2008, 2480-2490.
[22] Estellon, B., Gardi, F., & Nouioua, K. High-Performance Local Search for Task Scheduling with Human Resource Allocation. Lecture Notes in Computer Science, 2009, https://doi.org/10.1007/978-3-642-03751-1_1.
[23] Filho, F.C., Aparecid, D., Roch R., GuimarãesFernandes Costa, M., & Albuquerque Pereir, W.C. Using Constraint Satisfaction Problem approach to solve human resource allocation problems in cooperative health services. Expert Systems with Applications, 39(1), 2012, 385-394.
[24] Pérez, P., González-Cruz, M.C., & Diego, M.F. Human resource allocation management in multiple projects using sociometric techniques. International Journal of Project Management, 30(8), 2012, 901-913.
[25] Cabanillas, C., García, J.M., Resinas, M., Ruiz, D., Mendling, J., & Ruiz-Cortés, A. Priority-Based Human Resource Allocation in Business Processes. Lecture Notes in Computer Science, 2013, https://doi.org/10.1007/978-3-642-45005-1_26.
[26] Chien, T.H., Lin, Y.I., & Tien, K.W. Agent-based negotiation mechanism for multi-project human resource allocation. Journal of Industrial and Production Engineering, 30(8), 2013, 518-527.
[27] Stylianou, C., & Andreou, A.S. Human Resource Allocation and Scheduling for Software Project Management, 2014, https://doi.org/10.1007/978-3-642-55035-5_4.
[28] Ponsteen, A., & J.Kusters, R. Classification of Human- and Automated Resource Allocation Approaches in Multi-Project Management. Procedia - Social and Behavioral Sciences, 194, 2015, 165-173.
[29] Park, J., Seo, D., Hong, G., Shin, D., Hwa, J., & Ba, D.H. Human Resource Allocation in Software Project with Practical Considerations. International Journal of Software Engineering and Knowledge Engineering, 25(1), 2015, 5-26.
[30] Wibisono, A., Nisafani, A.S., Bae, H., & Park, Y.J. On-the-Fly Performance-Aware Human Resource Allocation in the Business Process Management Systems Environment Using Naïve Bayes. Lecture Notes in Business Information Processing, 219, 2015, https://doi.org/10.1007/978-3-319-19509-4_6.
[31] Roque, L., Araújo, A.A., Dantas, A., Saraiva, R., & Souza, J. Human Resource Allocation in Agile Software Projects Based on Task Similarities. Lecture Notes in Computer Science, 2016, https://doi.org/10.1007/978-3-319-47106-8_25.
[32] Lilia, ZH. An Inverse Optimization Model for Human Resource Allocation Problem Considering Competency Disadvantage Structure. Procedia Computer Science, 112, 2015, 1611-1622.
[33] Bouajaja, S., & Dridi, N. A survey on human resource allocation problem and its applications. Operation Research International Journal, 17, 2017, 339–369.
[34] Aviso, K.B., Cayamanda, C.D., & Mayol, A.P. Optimizing Human Resource Allocation in Organizations during Crisis Conditions: a P-graph Approach. Process Integration and Optimization for Sustainability, 1, 2017, 59–68.
[35] Arias, M., Saavedra, R., Marques, M.R., Munoz-Gama, J. & Sepúlveda, M. Human resource allocation in business process management and process mining: A systematic mapping study. Management Decision, 56(2), 2017, 376-405.
[36] Arias, M., Munoz-Gama, J., Sepúlveda, J., & Miranda, J.C. Human resource allocation or recommendation based on multi-factor criteria in on-demand and batch scenarios. European Journal of Industrial Engineering, 2018, https://doi.org/10.1504/ EJIE.2018.092009.
[37] Kolisch, R., & Sprecher, A. PSPLIB-a project scheduling problem library: OR software-ORSEP operations research software exchange program. European Journal of Operational Research, 96(1), 1997, 205–216.
[38] Fündeling, C.U., & Trautmann, N. A priority-rule method for project scheduling with work-content constraints. European Journal of Operational Research, 203(3), 2010, 568–574.
[39] Naber, A., & Kolisch, R. MIP models for resource-constrained project scheduling with flexible resource profiles. European Journal of Operational Research, 239(2), 2014, 335–348.
[40] Kolisch, R., Sprecher, A., & Drexl, A. Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science, 41(10), 1995, 1693–1703.
[41] Kolisch, R., & Hartmann, S. Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research, 174(1), 2006, 23–37.
[42] Van Peteghem, V., & Vanhoucke, M. An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances. European Journal of Operational Research, 235(1), 2014, 62–72.
[43] Hartmann, S. A competitive genetic algorithm for resource‐constrained project scheduling. Naval Research Logistics, 45(7), 1998, 733–750.
[44] Baumann, P., Fündeling, C.U., & Trautmann, N. The resource-constrained project scheduling problem with work-content constraints. In Handbook on Project Management and Scheduling, 1, 2015, 533–544.